HOME SERVICES ABOUT US NEWS ENVIRONMENT CONTACT US

Product Information

book


Ministry of Defence (MoD) Consultation

It is expected that developers will need to carry out consultation with the MoD to assess Wind Farm Radar and Wind Farm Aviation effects that a proposed wind farm development could have on military operations. Our MoD consultation service includes the submission of a MoD Consultation Pro-forma and covering letter, and electronic feedback of the response.

It should be noted that the MOD should be consulted if a proposed wind turbine is 11 metres to blade tip or taller, and has a rotor diameter of 2 metres or more. The minimum information required for accurate assessment of the impact of turbines is:

- Maximum hub height above ground level
- Rotor diameter
- Ordnance Survey grid reference (six figure easting and six figure northing) for each turbine
- Generation capacity

Back to Aviation and Radar